All Episodes

  Direct Link   Download 33 Minutes 09 Aug 2018

As Lovell prepared for the thruster adjustments, Haise finished closing down the LEM and drifted through the tunnel back toward the command module and Swigert threw the switch to stir all 4 cryogenic tanks.. . .